Project study

Assess a bolted joint through preload and grip length

A cylinder-head joint was assessed through external load, preload, settling and compliance to develop a practical design change.

FEA structural analysisWhen a stronger bolt alone is insufficient
Process & plant engineering · FEA structural analysis
Industry
Process & plant engineering
Services
FEA structural analysis

Engineering question

The recurring external load had to be translated into additional bolt force and remaining clamp force. A higher bolt strength class alone did not resolve the joint problem.

Model & approach

  • Calculate assembly preload, settling losses and bolt/clamped-part compliance
  • Supplement the calculation with local load-transfer and connection assessment
  • Assess strength class and grip length as interacting design variables

Boundary conditions

  • A preloaded joint under cyclic external loading
  • Bolt and washer arrangement as adjustable design details

Results of the assessment

  • Grip length materially influenced load sharing within the joint.
  • The assessment led to a proposed change in bolt and washer arrangement.

Engineering consequence

The recommendation connected material strength, preload and compliance into a practical direction for further joint design.

A similar question?

Let’s clarify the objective, available data and useful model fidelity.

Discuss a similar question